Operational

Rio Grande City, TX

A power farm operated by our teams, with 15 MW online today and expansion to 35 MW planned by 2026. The site supports both Bitcoin self-mining and hosting.

15

MW

ONLINE

480.2

PH/s

Power Deployed

20

MW

Additional (2026)

4,831

Operational Miners

Gird

Air Cooled

Operational

Rockdale, TX

A power farm designed and built by our teams, with 10 MW online today and expansion to 20 MW planned for Q2 2026. The site currently supports Bitcoin self-mining and will also host modular GPU-powered data centers from 2026.

10

MW

ONLINE

547

PH/s

Power Deployed

10

MW

Additional (Q2 2026)

2,400

Operational Miners

Gird

Air Cooled

Operational

Moore, TX

Our 2 MW pilot power farm supports Bitcoin hosting and includes our future repair and storage center. From 2026, the site is planned to expand to host modular GPU-powered data centers.

2

MW

ONLINE

81

PH/s

Power Deployed

TBD

AdditionaL

680

Operational Miners

Gird

Air Cooled

Commissioning 2026

Thorndale, TX

Our next power farm will be commissioned in two 15 MW phases, with the first planned for late 2025 and the second for 2026.

15

MW

To Be Energized

1,621

EH/s

Power Deployed

15

MW

AdditionaL (2027)

5,670

Operational Miners

Gird

Immersion

Commissioning 2026

Weslaco, TX

Our upcoming 15 MW power farm, planned for commissioning in 2026, will use immersion cooling to improve efficiency and reduce noise.

15

MW

To Be Energized

810

PH/s

Power Deployed

TBD

AdditionaL

2,835

Operational Miners

Gird

Immersion

Commissioning 2026

Wuliger, TX

Our upcoming 12 MW power farm, planned for commissioning in 2026, will use our next-generation immersion cooling system.

12

MW

To Be Energized

648

PH/s

Power Deployed

TBD

AdditionaL

2,268

Operational Miners

Gird

Immersion

Commissioning 2026

Athens, TX

Our upcoming 10 MW power farm, planned for commissioning in 2026, will use our next-generation immersion cooling system. An additional 50 MW is planned for 2027.

10

MW

To Be Energized

3,243

EH/s

Power Deployed

50

MW

Additional (Q2 2027)

11,340

Operational Miners

Gird

Immersion

Commissioning 2026

Prineville, OR

Our upcoming 4 MW power farm, planned for commissioning in 2026, is dedicated to AI and located near major data center infrastructure (Meta and Apple) in Prineville.

4

MW

To Be Energized

214.5

M

Power Deployed

TBD

Additional

3,300

Operational GPUS

Gird

Air Cooled

AI / HPC

Growth pipeline

From 27 MW today to 131 MW planned

now

27

MW online

Three operational sites in Texas

Q2 2026

42

MW planned

Thorndale phase 1 commissioning

2026

98

MW target

Weslaco, Wuliger, Athens, and Prineville

2027+

131

MW pipeline

Full deployment, including phase 2 expansions

Accelerating the energy transition and improving grid flexibility through flexible power use.

Contact us