Operational
A power farm operated by our teams, with 15 MW online today and expansion to 35 MW planned by 2026. The site supports both Bitcoin self-mining and hosting.
15
MW
ONLINE
480.2
PH/s
Power Deployed
20
MW
Additional (2026)
4,831
Operational Miners
Operational
A power farm designed and built by our teams, with 10 MW online today and expansion to 20 MW planned for Q2 2026. The site currently supports Bitcoin self-mining and will also host modular GPU-powered data centers from 2026.
10
MW
ONLINE
547
PH/s
Power Deployed
10
MW
Additional (Q2 2026)
2,400
Operational Miners
Operational
Our 2 MW pilot power farm supports Bitcoin hosting and includes our future repair and storage center. From 2026, the site is planned to expand to host modular GPU-powered data centers.
2
MW
ONLINE
81
PH/s
Power Deployed
TBD
AdditionaL
680
Operational Miners
Commissioning 2026
Our next power farm will be commissioned in two 15 MW phases, with the first planned for late 2025 and the second for 2026.
15
MW
To Be Energized
1,621
EH/s
Power Deployed
15
MW
AdditionaL (2027)
5,670
Operational Miners
Commissioning 2026
Our upcoming 15 MW power farm, planned for commissioning in 2026, will use immersion cooling to improve efficiency and reduce noise.
15
MW
To Be Energized
810
PH/s
Power Deployed
TBD
AdditionaL
2,835
Operational Miners
Commissioning 2026
Our upcoming 12 MW power farm, planned for commissioning in 2026, will use our next-generation immersion cooling system.
12
MW
To Be Energized
648
PH/s
Power Deployed
TBD
AdditionaL
2,268
Operational Miners
Commissioning 2026
Our upcoming 10 MW power farm, planned for commissioning in 2026, will use our next-generation immersion cooling system. An additional 50 MW is planned for 2027.
10
MW
To Be Energized
3,243
EH/s
Power Deployed
50
MW
Additional (Q2 2027)
11,340
Operational Miners
Commissioning 2026
Our upcoming 4 MW power farm, planned for commissioning in 2026, is dedicated to AI and located near major data center infrastructure (Meta and Apple) in Prineville.
4
MW
To Be Energized
214.5
M
Power Deployed
TBD
Additional
3,300
Operational GPUS
now
27
Three operational sites in Texas
Q2 2026
42
Thorndale phase 1 commissioning
2026
98
Weslaco, Wuliger, Athens, and Prineville
2027+
131
Full deployment, including phase 2 expansions